New Bedford, Massachusetts
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in New Bedford.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report for New Bedford reviews your plans against 780 CMR and local coastal construction requirements within 24 hours for $250. New Bedford's historic mill building conversions, waterfront flood zone regulations, and maritime industrial facilities present unique code compliance challenges that benefit from early plan review before formal inspection.
Prepared for Acme Mechanical Inc.
Location
New Bedford, MA
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in New Bedford, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Historic mill building adaptive reuse plan lacks seismic evaluation of existing unreinforced masonry walls per 780 CMR Chapter 34
Mill conversion loft units exceed travel distance to exit in open-plan layout without required intermediate sprinkler zoning
Coastal commercial HVAC condenser units lack corrosion-resistant coatings required for salt air exposure within 3,000 feet of shoreline
Shore power connection at marina service building missing ground fault protection per NEC 555.3 for boat slips
Replacement windows in National Register-listed whaling district building do not meet Stretch Code U-factor while maintaining historic profile
Seafood processing facility grease interceptor undersized for projected wastewater flow per 248 CMR
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What codes apply to mill building conversions in New Bedford?
Mill conversions in New Bedford must comply with 780 CMR Chapter 34 for existing buildings, including structural evaluation, fire separation upgrades, and egress improvements. Historic tax credit projects also need to coordinate with the Massachusetts Historical Commission.
Does the report address New Bedford's coastal flood zone requirements?
Yes. For properties in New Bedford's FEMA VE and AE flood zones along Buzzards Bay, the report checks flood-resistant construction, breakaway wall design, elevation requirements, and mechanical equipment placement above base flood elevation.
How much does a New Bedford inspection readiness report cost?
The report costs $250 with 24-hour turnaround. It covers all major trades against 780 CMR, applicable NFPA standards, the MA Stretch Energy Code, and New Bedford's local zoning and waterfront overlay requirements.
Are maritime and industrial facilities covered in the review?
Yes. The report addresses requirements specific to New Bedford's working waterfront, including marine electrical systems per NEC Article 555, industrial ventilation, hazardous material storage, and commercial kitchen exhaust for seafood processing.
What historic preservation issues does the report flag for New Bedford?
The report identifies potential conflicts with the New Bedford Historic District Commission guidelines, including facade alterations, window replacements, and signage in the downtown whaling historic district and waterfront areas.
Also in Massachusetts