HVAC & Mechanical · Boston, Massachusetts
HVAC & Mechanical inspection readiness
for Boston.
Send us photos of your hvac & mechanical work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Ductwork, equipment, refrigerant lines, condensate, ventilation, and IMC compliance.
Your first report is free · Limited spots each week
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your hvac & mechanical work in Boston, Massachusetts against the codes and specs that apply. Send photos of ductwork, equipment, refrigerant lines, condensate, ventilation, and imc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. Free — limited spots each week — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about hvac & mechanical inspections in Boston
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
HVAC inspection preparation in Boston?
mechanical inspection checklist in Boston?
what do HVAC inspectors look for in Boston?
ductwork inspection prep in Boston?
refrigerant line inspection requirements in Boston?
Three steps. Five minutes.
Submit your hvac & mechanical job, and our patent-pending AI reviews every photo against the standards that apply in Boston.
Tell us about your hvac & mechanical job.
Project name, address in Boston, and scope. We look up the applicable standards automatically.
Send photos of your hvac & mechanical work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging hvac & mechanical deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
HVAC & Mechanical findings we help catch in Boston.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Snow load calculation uses 40 psf ground load instead of Boston's required 45 psf per 780 CMR Chapter 16
HVAC system in Back Bay brownstone renovation lacks makeup air for kitchen exhaust per IMC 505
Panel clearance reduced to 30 inches by plumbing chase in triple-decker basement, minimum 36 inches required
Window U-factor of 0.32 does not meet Boston's Stretch Code requirement of 0.27 for Climate Zone 5A
Send us one hvac & mechanical job. Get a full findings report. No cost, no commitment.
Every report is reviewed by a QA professional before delivery. That means we can only take a limited number each week.
GET YOUR FREE HVAC & MECHANICAL REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.