Electrical · Boston, Massachusetts
Electrical inspection readiness
for Boston.
Send us photos of your electrical work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Panels, wiring, conduit, grounding, AFCI/GFCI, service equipment, and NEC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your electrical work in Boston, Massachusetts against the codes and specs that apply. Send photos of panels, wiring, conduit, grounding, afci/gfci, service equipment, and nec compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about electrical inspections in Boston
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
how do I prepare for an electrical inspection in Boston?
electrical inspection checklist in Boston?
what do electrical inspectors look for in Boston?
pre-inspection review electrical in Boston?
electrical rough-in inspection prep in Boston?
Three steps. Five minutes.
Submit your electrical job, and our patent-pending AI reviews every photo against the standards that apply in Boston.
Tell us about your electrical job.
Project name, address in Boston, and scope. We look up the applicable standards automatically.
Send photos of your electrical work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging electrical deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Electrical findings we help catch in Boston.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Snow load calculation uses 40 psf ground load instead of Boston's required 45 psf per 780 CMR Chapter 16
HVAC system in Back Bay brownstone renovation lacks makeup air for kitchen exhaust per IMC 505
Panel clearance reduced to 30 inches by plumbing chase in triple-decker basement, minimum 36 inches required
Sprinkler coverage gaps in Big Dig-adjacent below-grade parking structure do not meet NFPA 13 spacing
Backflow preventer missing on landscape irrigation tie-in at Seaport District mixed-use project
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR ELECTRICAL REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.