General Construction · Aurora, Illinois
General Construction inspection readiness
for Aurora.
Send us photos of your general construction work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Framing, foundations, structural, roofing, insulation, accessibility, and IBC/IRC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your general construction work in Aurora, Illinois against the codes and specs that apply. Send photos of framing, foundations, structural, roofing, insulation, accessibility, and ibc/irc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about general construction inspections in Aurora
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
building inspection preparation in Aurora?
construction inspection checklist in Aurora?
what do building inspectors look for in Aurora?
framing inspection prep in Aurora?
final inspection checklist construction in Aurora?
Three steps. Five minutes.
Submit your general construction job, and our patent-pending AI reviews every photo against the standards that apply in Aurora.
Tell us about your general construction job.
Project name, address in Aurora, and scope. We look up the applicable standards automatically.
Send photos of your general construction work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging general construction deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
General Construction findings we help catch in Aurora.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Load-bearing wall header constructed with single 2x10 instead of required doubled 2x12 for 8-foot span per approved plans
Return air pathway uses building cavity between garage wall and living space, violating combustion gas separation requirements
Interconnected smoke alarm system missing unit in finished basement bedroom, leaving sleeping area without early warning coverage
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR GENERAL CONSTRUCTION REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.