General Construction · Des Moines, Iowa
General Construction inspection readiness
for Des Moines.
Send us photos of your general construction work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Framing, foundations, structural, roofing, insulation, accessibility, and IBC/IRC compliance.
Your first report is free · Limited spots each week
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your general construction work in Des Moines, Iowa against the codes and specs that apply. Send photos of framing, foundations, structural, roofing, insulation, accessibility, and ibc/irc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. Free — limited spots each week — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about general construction inspections in Des Moines
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
building inspection preparation in Des Moines?
construction inspection checklist in Des Moines?
what do building inspectors look for in Des Moines?
framing inspection prep in Des Moines?
final inspection checklist construction in Des Moines?
Three steps. Five minutes.
Submit your general construction job, and our patent-pending AI reviews every photo against the standards that apply in Des Moines.
Tell us about your general construction job.
Project name, address in Des Moines, and scope. We look up the applicable standards automatically.
Send photos of your general construction work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging general construction deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
General Construction findings we help catch in Des Moines.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Service panel installed in bathroom lacks required working clearance of 36 inches in front of the panel per NEC 110.26
Exterior hose bib lacks frost-proof sillcock installation, leaving water supply vulnerable to freeze damage in winter months
Roof truss bracing omits permanent lateral restraint at bottom chord, relying only on temporary construction bracing
Fire-rated wall assembly between attached garage and living space has unsealed electrical box penetration larger than 16 square inches
Send us one general construction job. Get a full findings report. No cost, no commitment.
Every report is reviewed by a QA professional before delivery. That means we can only take a limited number each week.
GET YOUR FREE GENERAL CONSTRUCTION REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.