General Construction · Des Moines, Iowa
General Construction inspection readiness
for Des Moines.
Send us photos of your general construction work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Framing, foundations, structural, roofing, insulation, accessibility, and IBC/IRC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your general construction work in Des Moines, Iowa against the codes and specs that apply. Send photos of framing, foundations, structural, roofing, insulation, accessibility, and ibc/irc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about general construction inspections in Des Moines
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
building inspection preparation in Des Moines?
construction inspection checklist in Des Moines?
what do building inspectors look for in Des Moines?
framing inspection prep in Des Moines?
final inspection checklist construction in Des Moines?
Three steps. Five minutes.
Submit your general construction job, and our patent-pending AI reviews every photo against the standards that apply in Des Moines.
Tell us about your general construction job.
Project name, address in Des Moines, and scope. We look up the applicable standards automatically.
Send photos of your general construction work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging general construction deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
General Construction findings we help catch in Des Moines.
Examples based on past reports — each includes the photo, location, and the reference checked against.
HVAC condensate drain line lacks secondary overflow pan or float switch shutoff in attic installation above finished space
Fire-rated wall assembly between attached garage and living space has unsealed electrical box penetration larger than 16 square inches
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR GENERAL CONSTRUCTION REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.