Energy & Utilities · Des Moines, Iowa
Energy & Utilities inspection readiness
for Des Moines.
Send us photos of your energy & utilities work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Substations, switchgear, utility poles, arc flash, NESC, and OSHA 1910.269 compliance.
Your first report is free · Limited spots each week
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your energy & utilities work in Des Moines, Iowa against the codes and specs that apply. Send photos of substations, switchgear, utility poles, arc flash, nesc, and osha 1910 and your tracking list — get a written findings report within 24 hours* scoring every item. Free — limited spots each week — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about energy & utilities inspections in Des Moines
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
utility inspection preparation in Des Moines?
substation inspection checklist in Des Moines?
energy facility inspection requirements in Des Moines?
NESC inspection prep in Des Moines?
arc flash inspection requirements in Des Moines?
Three steps. Five minutes.
Submit your energy & utilities job, and our patent-pending AI reviews every photo against the standards that apply in Des Moines.
Tell us about your energy & utilities job.
Project name, address in Des Moines, and scope. We look up the applicable standards automatically.
Send photos of your energy & utilities work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging energy & utilities deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Energy & Utilities findings we help catch in Des Moines.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Continuous insulation gap at rim joist area measures 4 inches wide, breaking the thermal envelope required by Iowa Energy Code
Service panel installed in bathroom lacks required working clearance of 36 inches in front of the panel per NEC 110.26
Exterior hose bib lacks frost-proof sillcock installation, leaving water supply vulnerable to freeze damage in winter months
HVAC condensate drain line lacks secondary overflow pan or float switch shutoff in attic installation above finished space
Fire-rated wall assembly between attached garage and living space has unsealed electrical box penetration larger than 16 square inches
Send us one energy & utilities job. Get a full findings report. No cost, no commitment.
Every report is reviewed by a QA professional before delivery. That means we can only take a limited number each week.
GET YOUR FREE ENERGY & UTILITIES REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.