Electrical · Des Moines, Iowa
Electrical inspection readiness
for Des Moines.
Send us photos of your electrical work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Panels, wiring, conduit, grounding, AFCI/GFCI, service equipment, and NEC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your electrical work in Des Moines, Iowa against the codes and specs that apply. Send photos of panels, wiring, conduit, grounding, afci/gfci, service equipment, and nec compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about electrical inspections in Des Moines
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
how do I prepare for an electrical inspection in Des Moines?
electrical inspection checklist in Des Moines?
what do electrical inspectors look for in Des Moines?
pre-inspection review electrical in Des Moines?
electrical rough-in inspection prep in Des Moines?
Three steps. Five minutes.
Submit your electrical job, and our patent-pending AI reviews every photo against the standards that apply in Des Moines.
Tell us about your electrical job.
Project name, address in Des Moines, and scope. We look up the applicable standards automatically.
Send photos of your electrical work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging electrical deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Electrical findings we help catch in Des Moines.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Service panel installed in bathroom lacks required working clearance of 36 inches in front of the panel per NEC 110.26
Exterior hose bib lacks frost-proof sillcock installation, leaving water supply vulnerable to freeze damage in winter months
Roof truss bracing omits permanent lateral restraint at bottom chord, relying only on temporary construction bracing
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR ELECTRICAL REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.