General Construction · Tampa, Florida
General Construction inspection readiness
for Tampa.
Send us photos of your general construction work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Framing, foundations, structural, roofing, insulation, accessibility, and IBC/IRC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your general construction work in Tampa, Florida against the codes and specs that apply. Send photos of framing, foundations, structural, roofing, insulation, accessibility, and ibc/irc compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about general construction inspections in Tampa
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
building inspection preparation in Tampa?
construction inspection checklist in Tampa?
what do building inspectors look for in Tampa?
framing inspection prep in Tampa?
final inspection checklist construction in Tampa?
Three steps. Five minutes.
Submit your general construction job, and our patent-pending AI reviews every photo against the standards that apply in Tampa.
Tell us about your general construction job.
Project name, address in Tampa, and scope. We look up the applicable standards automatically.
Send photos of your general construction work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging general construction deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
General Construction findings we help catch in Tampa.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Tile roof attachment lacks mortar-set and mechanical clips required for Wind Zone 3 exposure C per FBC 1523.7
Polybutylene supply piping visible in crawlspace; Tampa requires replacement during renovation permits per local amendment
Condensate drain line routed into storm sewer instead of approved indirect waste receptor violating FBC Plumbing 802.1
Outdoor panel enclosure rated NEMA 1 instead of NEMA 3R required for wet locations in Tampa's coastal environment
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR GENERAL CONSTRUCTION REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.