Electrical · San Francisco, California
Electrical inspection readiness
for San Francisco.
Send us photos of your electrical work and your tracking list. Get a written findings report within 24 hours* — before your inspector does.
Panels, wiring, conduit, grounding, AFCI/GFCI, service equipment, and NEC compliance.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Code Buddy's Inspection Readiness Report checks your electrical work in San Francisco, California against the codes and specs that apply. Send photos of panels, wiring, conduit, grounding, afci/gfci, service equipment, and nec compliance and your tracking list — get a written findings report within 24 hours* scoring every item. $250, one time — nothing new found, no charge.
Trusted by teams at
Common questions
What teams ask about electrical inspections in San Francisco
These are the questions field teams ask before an inspection. Our report answers all of them for your specific job.
how do I prepare for an electrical inspection in San Francisco?
electrical inspection checklist in San Francisco?
what do electrical inspectors look for in San Francisco?
pre-inspection review electrical in San Francisco?
electrical rough-in inspection prep in San Francisco?
Three steps. Five minutes.
Submit your electrical job, and our patent-pending AI reviews every photo against the standards that apply in San Francisco.
Tell us about your electrical job.
Project name, address in San Francisco, and scope. We look up the applicable standards automatically.
Send photos of your electrical work.
Upload directly, share a Drive/Dropbox link, or email them. Your existing tracking sets the bar.
AI reviews every photo.
Cross-references against codes, specs, and your tracking — flagging electrical deviations your list missed.
Get your report within 24 hours*.
Each finding includes the photo, location, and reference. Sorted by severity.
Electrical findings we help catch in San Francisco.
Examples based on past reports — each includes the photo, location, and the reference checked against.
Mandatory soft-story retrofit wood shear wall nailing pattern does not match approved DBI retrofit plan sheet
All-electric building service lacks 200A minimum panel capacity required by SF electrification reach code
Heat pump installation in historic district exceeds noise limit at property line per SF noise ordinance
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET YOUR ELECTRICAL REPORTLimited spots each week.
Every report is reviewed by a QA professional before delivery. Submissions are reviewed in order received.