Fort Smith, Arkansas
Find what your
punch list missed.
Send us photos and your tracking list. Get a written findings report within 24 hours* — before your inspector or auditor does.
— any industry with field inspections in Fort Smith.
$250, one time · Nothing new, no charge · You keep the report either way
*Depending on availability. We'll confirm turnaround when you submit.
Fort Smith contractors can get a written Inspection Readiness Report for $250 with results delivered within 24 hours. Submit your photos and tracking list before your inspection, and receive documented findings covering compliance issues relevant to Fort Smith's Arkansas River Valley climate, historic building renovation standards, and the mixed residential and industrial construction common along the Oklahoma border corridor.
Prepared for Acme Mechanical Inc.
Location
Fort Smith, AR
Date
Aug 8, 2026
Trade
Electrical
Findings
Penetration seal not matching approved submittal — visible gap at fire-rated assembly
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data sheet — 6" OC required, measured at 9" OC
Checked against: Project Spec 08-31
Working clearance below required minimum at panel — 30" required, 22" measured
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Three steps. Five minutes.
Submit your job, and our patent-pending AI technology reviews every photo against your standards, specs, and existing tracking.
Tell us about the job.
Project name, address in Fort Smith, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Send your photos and open items.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing tracking sets the bar — anything already on it doesn't count as a finding.
Our patent-pending technology and AI system analyze every photo.
Cross-references each image against your specs, the applicable standards, and your existing tracking — helping identify deviations your list may have missed.
Get your report within 24 hours*.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Built by Code Buddy.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Industries supported
Report turnaround
If nothing new identified
The kind of things we help catch.
Examples based on past reports. Each finding includes the photo, location, and the reference it was checked against.
Foundation pier spacing on Fort Smith expansive clay soil exceeds maximum allowed without engineered geotechnical report per IRC R401.4
Service entrance conductors routed through building interior without required protection per NEC 230.6 in historic Fort Smith storefront
Gas furnace combustion air intake located less than 10 feet from sewer vent termination per IFGC 304.11
Existing cast iron drain tie-in at historic building uses banded coupling instead of required approved transition fitting
Blown-in insulation in Fort Smith attic blocking soffit ventilation baffles reducing required 1:150 ventilation ratio
Second layer of shingles installed over existing without tear-off on Fort Smith commercial building exceeding two-layer maximum
And only if we identify something that wasn't already on your list.
If everything identified was already on your list, you pay nothing. You keep the report either way.
GET STARTEDLimited spots each week.
Every report is reviewed by a QA professional before delivery — not just generated and sent. That human review step means we can only take a limited number of jobs per week. Submissions are reviewed in the order they're received, and we'll let you know upfront if your report will take longer than 24 hours.
Before you ask.
What does a Fort Smith Inspection Readiness Report include?
The report provides a written review of your submitted photos and tracking list against Fort Smith's adopted building codes. Findings are organized by trade with severity levels, code references, and descriptions of what needs to be corrected before your scheduled inspection.
Does the report address Fort Smith's historic building renovation issues?
Yes. Fort Smith has a significant inventory of historic commercial and residential structures. The report identifies code compliance issues common in adaptive reuse projects, including electrical service upgrades, plumbing tie-ins to existing systems, and structural modification requirements.
How does the $250 report handle Fort Smith's soil conditions?
The Arkansas River Valley's expansive clay soils create foundation challenges that Fort Smith inspectors watch closely. The report checks for proper pier spacing, foundation drainage, and structural details that account for soil movement common in the Fort Smith area.
What is the turnaround time?
You receive the written findings within 24 hours of submitting your photos and tracking list. This gives Fort Smith contractors time to address any issues before their inspector arrives, avoiding the rescheduling delays that come with a failed inspection.
Can I use this for industrial projects in Fort Smith?
The report covers residential, commercial, and light industrial projects. Fort Smith's economy includes manufacturing and logistics facilities, and the review adapts to the applicable code sections for your specific permit type and construction scope.
Also in Arkansas